I am using the athena line. I've started using less of that now too. It lists 1500 or 2100ppm. Measuring as listed on the feed schedule, I get the 2100 number. I've reduced that to about 1600/1700.
The FF sledgehammer is on their feed schedule to flush every 3 or 4 weeks.