JustGrowWithIt
- Posts
- 95
- Reactions
- 196
- Joined
- Sep 11, 2020
- Points
- 33
I've got a 20ft unit which will be heavily braced on the inside with 4inch channel.
Entrance will be through a hatch in the ceiling.
Venting, plumbing, the works really.
I think by being in ground I'm going to really have great success at keeping temps and humidity in line. Unit will soon be ready. Completely waterproofed and I will have a concrete pad above it directing water away.
What are your thought?
Entrance will be through a hatch in the ceiling.
Venting, plumbing, the works really.
I think by being in ground I'm going to really have great success at keeping temps and humidity in line. Unit will soon be ready. Completely waterproofed and I will have a concrete pad above it directing water away.
What are your thought?