Great thread,
If my 1000w runs roughly 10amps @ 120v. Then if I run it @ 240v it is 5amps, but is it still 10amps against my 100amp main?
thanks Hiboy
Okay it is 100amps @240v. I knew that was easy. Thank you forum!
Great thread,
If my 1000w runs roughly 10amps @ 120v. Then if I run it @ 240v it is 5amps, but is it still 10amps against my 100amp main?
thanks Hiboy
ur most likely overloading your breaker,,Rechecked the breaker and it's fine, checked the controller and its working, I believe that I just over loaded the breaker to make it trip, but then again I'm not too sure. I ran the A/C unit for the veg room before flipping and never had an issue, but now I have that HPS light going and the off and on A/C unit, the dehumidifier and the CO2 generator.
Thanks, great info.bnutt have you considered a flipbox?ive got the same setup 2 4k rooms on a flip using 1 30 amp plug,it also saves you from buying 4 more ballasts.I use the powerbox lsm12 flipbox and a dpc7500 controller,they have a simple graphic that shows how it works on their website,click on support and then on flipboxes,it explains how a flip works pretty well.
that wire does not look to be able to handle ur load. For 150 amps u need at least 1/0 wire.Hey hi boy,
You've helped me in the past so I thought that I would pick your brain one more time and hopefully you'll have some answers for me. I have a main breaker box in the electrical room of my building that feeds my units 100 amp 3 phase panel. I was told that the wiring in between the fuse box and my distribution panel could handle 150 amp if I swapped out the fuses in the main shut off box. I have attached a picture of the inside of the main shut off so you can see.
Now If my information is correct, I wanted to see how I go about doing this. Do i just kill the power and swap out the 3 fuses for 150 amp versions?
Any help would be great.
Thanks in advance
if u run 2 wire u will not have a neutral at ur light controller but since ur operating 240v lights u should be ok.I had a question actually, I am sure it's been addressed but it's difficult to find definitive answer and I tend to be paranoid about electrical, lol... but I was thinking of hard-wiring a CAP 240V light timer/power box to my breaker box in the basement. Trouble is the side I designated as my garden area is the opposite side and would require a conservative estimate of 35 feet (at an angle above drop ceiling, which seems sketchy to me) or probably more like 50 feet if I was to go around the perimeter following the walls. Is using the full 50 feet in a roll of 10/2 going to be bad? I will run at most 4 600's probably and start with even less for now. The unit will support 4x 1000... is this going to be OK? would I be best off running a longer amount of cable to avoid the drop ceiling area? (other side of basement is unfinished, seems like a less fire risk but then again I would imagine insulated wiring shouldnt be one at all unless damaged.
Thanks, I am looking to install the breaker and do all wiring myself, it looks downright simple but scares me at the same time, hard wiring a power box like that seems easiest of any options too. I was going to just settle on 120v for now but I know it won't carry me along very far.
Hiboy, I have a Helios 3 - 240 Volt 4 Light Timer running 4 1000w on a 30 amp breaker. I wanted to mirror this setup. Can I split the wire going to the controler and hook it up to another controler and run them at opposite times? I just dont want to add a new breaker or new wire. Is there a better way of doing this? Thanks
if you can add any suggestions/advice, how major could a 4k watt grow be in a state that hasnt legalized mj yet??...of course "any" grow illegal is a risk, but would 4k set a "high risk" as far as having a very "noticeable" power consumption?? thanx........gg