Ok
I’m going to chop things up and reroute to allow for it to be submerged
my pump needs 11.66 gal per minute and u can hear it becoming unprimed when u start it now matter how much water/time u put into priming it
even my wife wants this working so I stop dabbing n drinking n fuking around...
for me to do this I just need to turn around my pump, buy longer 3/4” hose and slightly change the lines how water goes in/out of the chiller
do u believe the 3/4 feed will work, cuz if I proceed with this my 2” pvc will be my return to res.
than pull from res into chiller n out n back to pump
My build mine
I had something designed he laughed at
thanks for the help everyone
my clones have vegged 10 days in tote n are plenty big to goto into the 5 gal buckets
thinking better now
if I use the diagram u posted I’m going to be running in reverse
so the 2” pvc will be my return and 3/4” hose will be my feed. I don’t top feed either, should?
As of now buckets and res are the same height off the ground……I’d really like to get this going and not be...
Water goes left in pvc, gets to a 180 bend and comes back along flowing right to pump
pump pulls into res n res flows out the bottom to the 3 in room
very sorry, lots to drink
Pump pulls from buckets and dumps into res, pulled by pvc threw buckets n out return line to pump,
back into res, threw 2” pvc to 90 bend into 3/4 return line to pump
Than pump goes out right into chiller, back into res and essentially is pulled in reverse??
I’m not quite envisioning it yet???
it now goes right into chiller, back into res and sucked out the bottom w pvc
I believe I have something like that
it’s been killing me trying to get it, I’ve ran it in reverse, drain n filled with other pumps
will having higher water level help me get it figured out?
This has ran for 8 months
Hello guys
for the life of me I can’t get my system back to running normally, I get about 20% water flow no matter what pump I plug in. This setup is 8 months old with 3 runs under the belt
I have a 4x8 with a row of 3 buckets with 2” pvc/bulkheads, 3/4” return line. 700gph danner pump
My...
Build a strip light setup. Or buy a bar setup
Hlg has the refurnished eco panel for 499 usd on sale, add a 260 dual watt panel or two for full coverage