VinnieV
- 124
- 43
Cheers ponky! But still would have the same question seeing as the tents wouldn’t have much of a thermal insulating value.10'x10' tents. Easy. Cheap.
Well tents are quick to take down and move. If you put up foam board and poly it would be hard to take down in a hurry. A tent insulates decently well. If you have room get a 10x10. And a 5x10 and use the ⅓ for veg and the big side for flower. Or 8x8 and a 4x8 and have some room on the sides.Cheers ponky! But still would have the same question seeing as the tents wouldn’t have much of a thermal insulating value.
Room is around 10’ x 15’. Typically would run the full thing flood and drain. I also run opticlimate for temp control.
Would like to use the full room as is if possible. Just still concerned about heat signature. Fortunately no heat signature from the roof so I’m semi relieved. But if three external walls show up hot… could be dumb on my part!
edit - typo
Here lumber went 5x higher. But foam and insulation stayed put. Poly was the same. House wrap went up. Was inconsistent.Yeah that’s exactly what I do, well, stud frame, foam board, sheet, poly and tape. Just trying to see if I need to delay this run to fix… flu has made building materials go wild over here
Well as we run through all the cheaper products we’re all being forced to move up a grade - by winter we’ll have roofs sheeted with birch ply!Here lumber went 5x higher. But foam and insulation stayed put. Poly was the same. House wrap went up. Was inconsistent.
124 CDN for a sheet of 3/4 standard ply. Not even birchface... that was the peak. Finished 350 sqf of deck surface and beams just before it happened. Would have cost me thousands. Even concrete doubled.Well as we run through all the cheaper products we’re all being forced to move up a grade - by winter we’ll have roofs sheeted with birch ply!
Blooody hell. I’ve stocked up on so much material for jobs on the books. Got a mile of timber at the yard that I’m have tempted to flip for a profit124 CDN for a sheet of 3/4 standard ply. Not even birchface... that was the peak. Finished 350 sqf of deck surface and beams just before it happened. Would have cost me thousands. Even concrete doubled.
Honestly do it. My lumber guy says the drop is coming for end of summer. Peak price is now.Blooody hell. I’ve stocked up on so much material for jobs on the books. Got a mile of timber at the yard that I’m have tempted to flip for a profit
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?