Hello all,
not a newbie but got a question that's gonna sound kinda lame.
Upgrading to a unique new spot that became available to me- out of the way industrial spot. It is a large unit that has a room built inside it. It was built as a sound proof recording studio by a band. It's sealed, insulated and has a seperate room built as a vocal booth that is a perfect veg room. Really excited about this place but for the fact that it doesn't have much power to the room. Landlord says I can pull 3 phase into it from a line that runs right next to the room, and install a subpanel in my room to supply all the power in need.
Sounds fairly simple to me, so my questions are:
*is it that easy to tap the 3 phase "line" and route it in my room to a subpanel?
*is it fairly easy to hook up my light timer box to the subpanel (i would assume the eletrician installing the sub would have no problem with this.
*is this a job that can be done in a day, and what am I looking at ballpark for cost?
Gonna run 4k flower, 1k veg, 3 inline fans, dehuey and a 12,ooo btu window a/c.
thanks