Any help/suggestions are appreciated!
I just started my scene. I have 3 thouies and a 600 on my one 240V 30Amp circuit. Up to now (due to temp issues), I've only been running the two thouies and the 600. Finally figured out the temp issue, now trying to get my fourth working. Plugged in all four, and it ran fine for a few hours...sometime in the night it tripped my circuit breaker. I flipped it back on and all four ran fine for about an hour after they came on, but then flipped the breaker again.
I should be under my Amps/Volts for this circuit...also, if I was over my load, wouldn't it have shut off immediately upon powering up #4??
Everything is connected with 10 Guage wiring, so I shouldn't be over my load with the wiring either.
Not sure what to do here. Can't find any issues in the wiring, and the independent setup (electrical box) was used elsewhere previously for WAY more load than I am currently running. Any ideas or suggestions??
I just started my scene. I have 3 thouies and a 600 on my one 240V 30Amp circuit. Up to now (due to temp issues), I've only been running the two thouies and the 600. Finally figured out the temp issue, now trying to get my fourth working. Plugged in all four, and it ran fine for a few hours...sometime in the night it tripped my circuit breaker. I flipped it back on and all four ran fine for about an hour after they came on, but then flipped the breaker again.
I should be under my Amps/Volts for this circuit...also, if I was over my load, wouldn't it have shut off immediately upon powering up #4??
Everything is connected with 10 Guage wiring, so I shouldn't be over my load with the wiring either.
Not sure what to do here. Can't find any issues in the wiring, and the independent setup (electrical box) was used elsewhere previously for WAY more load than I am currently running. Any ideas or suggestions??