I've been doing a bit at a time. Now that the buds are growing away from the stems I'll be able to be a lot less invasive with the clean up effort. Eventually, I will have a nice relaxing weekend, but I don't see it in my near future. Ill just need to Finish roof underlayment, facia, drip edge, ice and water shield, metal on the roof, soffits, uninterrupted foam board insulation bonded to jnside of CMU walls, fir walls, windows and doors, plumbing top out, electrical rough, various framing blocking throughout, nailers for sheetrock on all applicable locations, framing inspection,batt insulation, sheetrock, tape and bed, float, sand, float, sand, texture, paint and a whole bunch of other stuff. I need to win the lottery. These will be ready so much sooner.