M
m4gikAL
- 2
- 0
Please help!
I've only got x2 Electrical sockets where I'm planning to grow. I understand that a lighting controller will be necessary, as to not fuse the segmental timer. This will take up both sockets leaving only x2 power sockets on the controller which will be timed accordingly for lighting.
As I will need to run a fan, aux oscillating fan, therm/humid meter etc.. as well as the lights, what way do I go about running all my stuff?
Can the second plug of the controller with the segmental timer, go into say a 6 plug extension bank? which would leave me with 5 sockets...
Cheers
I've only got x2 Electrical sockets where I'm planning to grow. I understand that a lighting controller will be necessary, as to not fuse the segmental timer. This will take up both sockets leaving only x2 power sockets on the controller which will be timed accordingly for lighting.
As I will need to run a fan, aux oscillating fan, therm/humid meter etc.. as well as the lights, what way do I go about running all my stuff?
Can the second plug of the controller with the segmental timer, go into say a 6 plug extension bank? which would leave me with 5 sockets...
Cheers