I know man but I've been putting myself in the poor house because of buying so many odds and ends things trying not to forget or take care of any future problems ahead of time by being the ultimate planner. I already spent extra $ on 4 mil mylar 100ft x 4ft roll to do whole room including floor, insulated ductwork, built an insulated sound deadening box for both 6 inch 454 cfm inline fans and both 6 inch 250 cfm booster fans for light cooling & exhaust system, sound deadening boxes for 1157 GPH air pump & 1200 GPH inline water pump, both of which I added 2 very heavy duty CPU heatsinks with 92mm speed controllable CPU case fans and using a 20 gallon cooler as a res that's inside a 3/4" thick MDF board box lined with 2" of foam board insulation including the lid with all seams sealed with cheap silicone, 8 5 gallon bucket modules, 3/4" flex hose plumbing a light tight RDWC will keep a 1 gallon frozen jug for 3 days when circulating 24/ 7!!!!! I was able to make all the sound deadening boxes using foam board & foam board glue so each component only weighs 2 pounds more then before making hanging the ventilation stuff lot easier. I guess I can't really complain about all these small things because all these extra little ideas have made me focus on each section / component maximizing it into not needing a chiller and a super quiet stealthy room so far. Once I finally figure out the best way to put up the mylar ( need a method or way I can do the ceilings and walls without help, nobody else knowing is best right?) then I can finally start a new mother plant...Dude I've been killing myself trying to think of everything to the point that yesterday I got a package from China I ordered that had a new set of cheap coveralls to put on to wear into my clean room I mean grow room to make sure I don't traffic anything in on my clothes etc. LOL!! So now it looks like I'll be obsessing about RF filters for my ballast until that's done lol Thanks for the input buddy!!