Alright so little text update while the reservoir is filling.
Taping and mudding went fine today. Ran out of expanding foam for sealing around floor so will have to run back out tomorrow.
Got a lot of stuff in from Amazon today. Unfortunately, I stripped the male end of the float valve so I went ahead and ordered the
hydro logic float valve. Waste of $20. Oh well. Wish you all could've seen me getting sprayed in the face by a faulty connection; it was epic.
Soil, worms, compost bin, earthboxes, and a ton of other shit will be here tomorrow. Spent a few hours tonight making a hole in my garage big enough for a pallet. That was interesting lol.
Now I'm sitting, drinking a beer with the small boy running. Gonna fill to about 30 gal and head upstairs and call it a night. Looking forward to checking out this BAS order tomorrow and starting to fill some pots with plants.
HVAC and electrician are scheduled for 2/4. In the interim for veg, I'll be utilizing a shoddy old wine cellar that I hung 3 x 1000w in prior to deciding to build out a full room down here.
Picking up the rest of my lights tomorrow as well. Need to start painting too.
Can you tell I'm a bit overwhelmed?