Ok, I have this breaker (shown below) on my sub panel, going to a 30 amp swith box which goes to a T104 timer. The timer has 4 x 220V outlets connected to it.
I currently have two 600w DUAL Lumatek ballasts. I want to upgrade to 6 x 1ks. That would be roughly 27 amps.
The qeustion is...Can I run 6k with my current light board setup?
http://i139.invalid.com/albums/q320/ryanwebstar5/Picture008.jpg
http://i139.invalid.com/albums/q320/ryanwebstar5/Picture009.jpg
I currently have two 600w DUAL Lumatek ballasts. I want to upgrade to 6 x 1ks. That would be roughly 27 amps.
The qeustion is...Can I run 6k with my current light board setup?
http://i139.invalid.com/albums/q320/ryanwebstar5/Picture008.jpg
http://i139.invalid.com/albums/q320/ryanwebstar5/Picture009.jpg