Got a lot of shit done last evening.
Took me 3 coats of epoxy floor paint to get good coverage on the shipping container. Took me 3 nights for 3 coats.
Got the green drywall hung, taped and mudded. Going to sand and paint the wall and door today.
Took about 3 hours to cut a 10" hole for the carbon filter and 2 trips to the hardware store to get the right tool.
Need to hang the brackets for the Gavitas, hang lights and tidy up electric cords.
Carbon filter needs to be hung, intake ports need to be cut in the floor. Going to have two 10" intake holes at each end.
Then the Reflectix needs to be hung. Hoping I can get this done today.
Tomorrow, the tables should be going in. The irrigation lines ran and plants finally in their home.
Decided to play around with Rockwool slabs. Haven't decided on DTW or recirculating drip on a timer.
Going to run the
Veg+Bloom 4/1 and it should crush it.