Giddeon
- Posts
- 599
- Reactions
- -7
- Joined
- Apr 9, 2009
- Points
- 28
If I have 4-75 gal reservoirs would it be possible to put a pump in each res have them pumping into a manifold all going into one line before entering the chiller then after chilling the water have it split again and go back into the individual reservoirs? All 4 res will be on the same nute schedule. I have sketched a picture that kinda maps out what I am trying to get at with this hope it helps the arrows show water flow direction.