Alright, like I said not setting everything up yet since I'm going to wait on that timer that's coming tomorrow. Couple things, I think I'm going to glue everything aside from the 90 degree coming out of the res. There was a slow, but steady, leak coming from the bottom of the PVC valve. But that was really about it. Everything seems to flow nicely and so on.
Alright so, it's a 6 valve manifold, I have 5 plants. What do I do with the 6th. I have it closed, but again, very slow leak. I'm thinking I just put a small thing of hose on it, and zip tie the shit out of it in a loop to essentially kink it.