Hey @hiboy
So I got a new Eaton 125amp sub-panel I am installing. I am only going to have it powered by a 50amp breaker in my main so I guess its a 50amp sub-panel...lol....Anyway before mounting it on the wall I am trying to figure out which "pre marked" holes to punch out on the sub-panel for the wires. I know that I am punching 1 hole on the top of the box so I can feed my 6/3 wire into it and know to punch out the 3/4in hole. Where I get confused is how many and which other holes to punch out. Part of me wants to punch them all out just so I have all the options but something tells me I shouldn't have open/punched holes unless they are going to be used, am I right? So from the sub-panel I am going to have a total of 3 but maybe 4 double gang boxes/outlets and one of those, the 240 double gang is going to be connected to a wired in digital timer box. Does each gang box need its own hole in the sub-panel for wire to feed in/out? What about the timer box? Is that another hole or is the wire going to go from the sub-panel to the timer box to the double gang box?? Sorry if I am being confusing but I'm still learning and trying to read as many articles and watch as many vids as I can....Also in case your wondering I am going to do all the work and wiring I can BUT when it comes time to deal with "live" electricity and connect the 6/3 to the main I will have an electrician come over, so don't worry, I won't be frying myself...this time....lol....If you could answer any of these q's and or have any other info/advice I would really appreciate it!! Please and thank you!!