Yep$ 150 to $185 per hour rates to survey here! Ouch ! Estimate was higher in hours because the section wasn`t surveyed and mapped. Also no nearby surveys done, lots of brush, trees, rocks and steep terrain.
Still no word on the parts for my Honda generator ! I`m thinking of getting a low hours light tower with a 3 cyl. diesel , 6000watt generator 110/220 plugs . comes on a trailer I should be able to pull with my S10 Blazer. Several low hour one`s around for $4000-5000. I`d sell the Generic 10,000 gas generator and keep the Honda gas generator (if it ever gets done) for a backup. Don`t plan on fixing the one in the motorhome .
At some point I`d like to do a full restoration on it, well maybe do a lot of custom work on it. All real wood cabinets and floors refurnish the sofa and chairs with leather and put built in solar and new generator. Also change the 460 engine to a 300 turbo Cummins diesel. But I really won`t ever have the time or the money for that, but if I were to use it on the road , that's what I`d like.