Log In Register

the crazy stuff you do

Cut wood every week end as a kid ! Hated it ! Just had to move to a warmer climate! Oops wrong pic ! Lmao
Home Forums Medical Cannabis Cultivation Grow Diaries the crazy stuff you do
Grow diary eligible · Medical Cannabis Cultivation

the crazy stuff you do

by basscaptain · Started
1d
Running
0
Updates
2,772
Replies
0
Images
Discussion below · 2,772 replies
Page 27 of 139 · Replies 521–540 of 2,773
20180302 115640
20180302 115621
20180302 125729
20180306 104341
20180322 155530
 
I started on the house in June and with everything that has happen this yr out here I got way behind....... I have regroup and came up with a plan that I'm going to get this shop done this winter... Next yr I'll spend outside finishing up what has/needs done then I'll get back on the house..... For the apt here I have almost everything I need to do it....

the only thing I don't have is the contour tops and tile for shower... I have just a cheap shower in here now but will make it nice.... it will end up looking like this in a way

I'll be in the shop for a yr longer then I was thinking.... I was thinking I would all ready be under roof on my home by nowView attachment 908790View attachment 908792View attachment 908793
you better than me,that mosiac tile,i cant put it up for shit,i say if you got running water and draining pipes making it a working shower move on,do it a room at a time bro,you you ever heard of a pole barn? just simple post in ground and a roof on it,we do this a lot here in texas,dig post in say for a 4 stall barn,when you get all your post in start with thwe rafters and roof,when you get the roof on ,nothing fancy at all just pitched enough to run offf water,then 1 stall at a time,come finsih them out,pout concrete floor,throw up walls move to next stall when you got thoise walld framed in go back to the first stall,lock in outside wall with commerical iron work around the back,and so on,i leave all door opening and just close them in when the job almost done with decrotive wndows ,still leaving the door entrance if down the road io want to open back up,but that cheap effective and ewasy housing and sky is the limit,my cabin did same shit,took 4 yrs to finish on board at a time,and when it was finished i didnt have any morgage payments,extra materials and so forth,land was paid off first then came the cabin,by age 40 i had a small cabin sitting on 1 acre of land with water and electric and only damn payment i have still to this day is taxes every year.
guess what i m getting at ,you might get frustrated,you might get over whelmed and who know what mama nature has up her sleave,you might not even think you will ever get finished,but doing sections instead of bulk will save a lot of headache,and then one day that little nest eggs lays there not a pennie owed and you sit back in that ole lawn chair and think how you did it slow and with not much hope cause you rushing yourself,and look at the neighbors fine ass homes and property take a draw off a good doobie maybe even a swig from a good beer ,and say my shit it tight and paid for,i want to got to hawia for a month just go if you dig
 
Do I pass
yes sir,looking good,work is that,the pay off is the last tile you lay and then enjoy,id done same thing,only as i rough finish a room ,i chart what needs to be done to finish ,document move to next and keep going,that when when you at the point you are tight now,you can take that log and figure materials to finish it and work with what your wallet provides instead of huge sums,its the tweeking that cost the bucks at least in my experiences
 
Bath cabs, wash room cabs
 

Attachments

  • 20191110_083735.jpg
    20191110_083735.jpg
    53.6 KB · Views: 71
  • 20191110_083759.jpg
    20191110_083759.jpg
    116.8 KB · Views: 71
  • 20191110_083745.jpg
    20191110_083745.jpg
    87 KB · Views: 69
Stove I got for 500dollars at Lowe's and kit cabinets I already stained them
 

Attachments

  • 20191110_084537.jpg
    20191110_084537.jpg
    148 KB · Views: 66
  • 20191110_084142.jpg
    20191110_084142.jpg
    132.6 KB · Views: 65
  • 20191110_084100.jpg
    20191110_084100.jpg
    107.3 KB · Views: 73
  • 20191110_084106.jpg
    20191110_084106.jpg
    101.6 KB · Views: 65
you better than me,that mosiac tile,i cant put it up for shit,i say if you got running water and draining pipes making it a working shower move on,do it a room at a time bro,you you ever heard of a pole barn? just simple post in ground and a roof on it,we do this a lot here in texas,dig post in say for a 4 stall barn,when you get all your post in start with thwe rafters and roof,when you get the roof on ,nothing fancy at all just pitched enough to run offf water,then 1 stall at a time,come finsih them out,pout concrete floor,throw up walls move to next stall when you got thoise walld framed in go back to the first stall,lock in outside wall with commerical iron work around the back,and so on,i leave all door opening and just close them in when the job almost done with decrotive wndows ,still leaving the door entrance if down the road io want to open back up,but that cheap effective and ewasy housing and sky is the limit,my cabin did same shit,took 4 yrs to finish on board at a time,and when it was finished i didnt have any morgage payments,extra materials and so forth,land was paid off first then came the cabin,by age 40 i had a small cabin sitting on 1 acre of land with water and electric and only damn payment i have still to this day is taxes every year.
guess what i m getting at ,you might get frustrated,you might get over whelmed and who know what mama nature has up her sleave,you might not even think you will ever get finished,but doing sections instead of bulk will save a lot of headache,and then one day that little nest eggs lays there not a pennie owed and you sit back in that ole lawn chair and think how you did it slow and with not much hope cause you rushing yourself,and look at the neighbors fine ass homes and property take a draw off a good doobie maybe even a swig from a good beer ,and say my shit it tight and paid for,i want to got to hawia for a month just go if you dig
Shhhh... this is my tax bill for 12acs and the shop.... I have 2 others coming but I should be under $ 500 for the yr.. vec regs $ 600.00 that will be right around a 1,100.00 for everything that the state wants every yr.... I paid more then that in car regs in ca .......
15734005018516330568983980789223
 
There out for the 1st time.. I'm not getting shit done today... lol
1573407184180349105222962050904
 

Attachments

  • 15734072535685762869571135872247.jpg
    15734072535685762869571135872247.jpg
    168.7 KB · Views: 70
  • 15734073471054893061862489909218.jpg
    15734073471054893061862489909218.jpg
    146.1 KB · Views: 67
  • 15734074064573472223523927675617.jpg
    15734074064573472223523927675617.jpg
    141.1 KB · Views: 71
Thinking about you Am.. 200amp I'm running everything outside on a 20 amp breaker to a inside gif:) 1 day soon I'll hook it up right
 

Attachments

  • 15734106012301618127967175731717.jpg
    15734106012301618127967175731717.jpg
    82.1 KB · Views: 64
  • 15734106503533950951581934418997.jpg
    15734106503533950951581934418997.jpg
    120.3 KB · Views: 73
  • 15734107164956116738685481128148.jpg
    15734107164956116738685481128148.jpg
    181.3 KB · Views: 70
Shhhh... this is my tax bill for 12acs and the shop.... I have 2 others coming but I should be under $ 500 for the yr.. vec regs $ 600.00 that will be right around a 1,100.00 for everything that the state wants every yr.... I paid more then that in car regs in ca .......View attachment 908913
mine finally went up 20 bucks this year,been same for past 30 yrs,1 acre with cabin and improvements 230 year,most of it is for school tax,im on board for those type taxes,but that said with apprasil finally going up,what was built within that 1 mile stretch
 
Page 27 of 139 · Replies 521–540 of 2,773
Back
Top Bottom