I am not worried about anything other than making sure i am using the proper methods to run these 600's (extension cords that can withstand 600 mag ballasts) and 400's. When i bought them i just went out, bought a ext cord with a man clock timer and plugged and played! Never realizing i could be fucking thi8ngs up.
One thing I've learned is that you don't believe what the panel says because so many things get changed and updated and panel labeling is not always accurate
Go ahead and run your 125 amp you can always derate the sub breaker if you have a problem with the house tripping the main but looking at your panel it is highly doubtful that it will
Hb
Can I use aluminum wiring to run the 1:25 amp number to line to save $?
Honestly I probably wouldn'tThanks again for the guidance that's the thing since I'm only on the year lease I only have potentially about three crops depending how I space them out or a few more smaller-sized crops if I do it monthly I'm just wondering how much I should invest to get this going compared to how much I'm going to get back after everything is said and done since it's only a year lease
Honestly I probably wouldn't
I came back to change this response I definitely would not do it for one year
Too much work building too much work growing to pull it down
Hb
@hiboy
I'm going to have a new build 3 phase power run to new setup.
Looking @ 480Y/277v
I thinking around 2000 amp/3000amp service to start might have to upgrade later, Looking to run 120v, 240v, 277v, & 3 phase 460 for large AC units, Gavita 277v lights, other misc 240v and 120v items.
My understanding is I will need a step down on a 277v branch to get a 240v/120v , Is this correct ?
Also for my setup do you think the 480Y/277v is the best 3 phase setup for this build ?
Also do you have a place you recommend to order panels/transformers from and what is the best brand to go with...Thanks
I am not worried about anything other than making sure i am using the proper methods to run these 600's (extension cords that can withstand 600 mag ballasts) and 400's. When i bought them i just went out, bought a ext cord with a man clock timer and plugged and played! Never realizing i could be fucking thi8ngs up.
Got a question for you boss first of all let me start by first of all let me start by I rent this place is built in 1974 From the breaker box I have a dedicated welding plug No use for it and I forgot to mention my living room and garage are on the same breaker can I exchange it to several regular plugs basically wired up so I can run my growtent in the garage I think it's a 30 amp fuse what it workPost any questions for electrical advice here.
hb
Got a question for you boss first of all let me start by first of all let me start by I rent this place is built in 1974 From the breaker box I have a dedicated welding plug No use for it and I forgot to mention my living room and garage are on the same breaker can I exchange it to several regular plugs basically wired up so I can run my growtent in the garage I think it's a 30 amp fuse what it work
Hey hi boy, later in the year once it warms up here(late april-may) would you be willing to walk me through wiring up a huge foam insulated basement? I got plans!
Kind of a joke it's a 15 amp if I'm running my thousand I can't have any AC in the house Way too much shit running through a 15 amp breaker That's the main reason I use LED because if the breaker flips LED comes right back on I had to wait too long with my HPs so do you think I could have that plug rewired with 4 to 8 regular plugsWhat size is the breaker all of your living room outlets are supposed to be 20 amp maximum or 15 amp depending on the wire
sounds like somethings wrong with the wiring in your panel
Hb
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?