Yeah i did this same thing all summer building my house im still not moving into yet
Drive from New York to Maine, stay 2 days and build. Then drive home for 2 days, did this all fall of 21, spring, summer and fall of 22. Now theres a bunch of shit wrong cause i tried to cut corners on small shit. Gable end leaked and froze so it exploded a bunch of siding, broke the OSB, ruined the insulation inside the wall, plus the sheetrock in the basement on top of the frostwall, its a raised ranch so we only did a 4 foot frost wall. Its a nightmare, the town is giving me a run around cause the house doesnt meet the specifics it needed to be, which it passed the initial inspection. So prolly listing it in the spring.